1. Evacuation design measures           

According to the actual situation of the project, the evacuation water park design can be carried out according to the following measures:           

(1) The maximum number of passengers in the main entertainment facilities of the project is fixed. It is suggested that the number of evacuated people should be designed according to the maximum design capacity of the park, and the measures of personnel excess restriction should be adopted.           

(2) Evacuation distance design. The project space is large, which is conducive to personnel evacuation. At the same time, evacuation distance design refers to some international design methods. For example, NFPA 101 stipulates that in buildings equipped with automatic sprinkler fire extinguishing system, the maximum evacuation distance can reach 60 m; NFPA 130 stipulates that the platform evacuation distance can reach 91.4 m; NFPA 500 points out that the evacuation walking distance can reach 76m for crowded places such as stations; British DD 9999 points out that due to the high evacuation distance. Relatively low space between large houses has greater smoke storage capacity, and smoke drops for a long time. Fire environment will not deteriorate rapidly, providing more evacuation time. Therefore, large space can extend evacuation distance correspondingly in the process of fire demonstration.           

2. Optimizing the design of smoke control and exhaust system           

In order to effectively eliminate fire smoke, smoke exhaust areas should be reasonably divided according to the main functional characteristics of the site and smoke prevention separation conditions and other factors. In view of the large space has a certain smoke storage function, the electric smoke exhaust window should be set as high as possible to eliminate the smoke rising to the steel frame structure in time, so as to prevent the spread to the human activity area. In order to ensure the effect of smoke exhaust, we should make full use of the first floor entrance and exit for natural air supplement. The air supplement amount should not be less than 50% of the smoke exhaust amount.           

3. Layered Linear Smoke Fire Detector (Corresponding Specification)           

When fire occurs in general space, fire smoke will rise rapidly to the roof, so setting fire detection device in the roof can effectively detect fire. For large space, it takes a certain time for smoke to rise to the ceiling, and smoke concentration and temperature will decrease due to air entrainment during the rising process. Therefore, the stratification of smoke should be fully considered in the setting of smoke detectors in large space. For space locations with height greater than 12m, the detection mode of layered network should be adopted for beam smoke detectors, and layered detectors should be interlaced with lower detectors. 

water park design
water park equipment from HAISAN water park design 

Related News
  • Water park equipment manufacturer: How long does it take to build a water park?

    Water park equipment manufacturer: How long does it take to build a water park?

    November 20, 2020The water park is basically divided into two parts, one is the civil engineering part, and the other is the water park equipment manufacturing and installation.view
  • Inspection for water slide equipment in water parks

    Inspection for water slide equipment in water parks

    April 27, 2020It is necessary to record all inspections, operating test, water quality monitoring and control, all accidents and abnormalities faithfully by the way of log record. The record should be kept at least 6 years from the date of final entry. The record of 12view
  • Water park construction period

    Water park construction period

    July 17, 2020If we do not consider the time for investor’s approvalprocedures and if civil engineering and water slide equipment production start at the sametime, the construction period of the water park project...view
  • Who is traveling at night, big data tells you!-1

    Who is traveling at night, big data tells you!-1

    January 8, 2020Who is traveling at night, big data tells you!-1 Night tourism, as an important way to meet people's longing for a better life, boost tourism consumption, promote supply-side reforms and enrich deep cultural experiences, will provide new momentum for tview
  • Haisan Water Park Equipment In Uzbekistan LLC Water Park

    Haisan Water Park Equipment In Uzbekistan LLC Water Park

    July 7, 2017After two month installation, the LLC water park in Uzbekistan is open to the public on 7th, August! Almost three thousand people come to this water park to enjoy the water and play the slide when it ...view
  • New Trend of Design and Operation of Water Park Equipment

    New Trend of Design and Operation of Water Park Equipment

    July 7, 2017With the continuous progress of social civilization, the people's economic life has improved, people's willingness to participate in tourism and entertainment are more and more intense. Operators continue to develop new tourism projects and leisure theme,view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us
QR Cord
QR Cord